Status of SHINE Cryomodule Development and Infrastructure Construction

Date:2021-02-18View:10

Date: Thursday 18th February 2021 Title: Status of SHINE Cryomodule Development and Infrastructure Construction 

Speaker: Lixin Yin, Chief Engineer of SHINE Project, SSRF, SARI, CAS 

Abstract: SHINE project is under the key technology R&D, the main facility engineering design, and the  building construction period. For the superconducting RF R&D, three works are carried out in  parallel. First, a group of prototypes of the key components are designed, fabricated and  tested. Furthermore, using these components, a series of trial assembly of a cryomodule were  performed to confirm the design, the assembly process, as well as to train the technical team.  Last, two test cryomodules with cavity mock-ups were assembled. One of them is used for  transportation test, and the other for cool-down test. A cryomodule with the first set of 8 cavities is under assembling, which aims for the horizontal test in spring 2021. A cryomodule  assembling and test workshop is established in Shanghai, and a cavity surface treatment  platform in Wuxi, in order to support the project. This talk will give a general introduction on the  progress of SHINE cryomodule R&D and the infrastructure construction.